Monday, January 13, 2014

Are Dated Design Compromises Affecting Your HMI and History Data Precision?

I got busy in the purported Christmas break and wrote a bunch of blogs.  This blog is a roadmap through several related areas. Read on to
  • learn if you are overloading the exception report generation of nodes
  • verify under-utilization and improve your console and history data
  • automatically detect and report exception report delays
Most systems worry about the above, and most were configured a decade or two ago. Learn if you can get much more out of what you have.

For many INFI 90 systems, the power of the modern NIS21/NPM22 hardware capability will allow you to get much more precise data to consoles and history systems.

If you have DBDOC, you can find out, for every PCU / node that you think is heavily loaded, if it really is. Heavy loading is 50% to 90%, overloading above that.  This is how to do it:

Monitoring Node Communication CPU Load

If you find the communication CPU usage in the 10% range, you are not getting enough out of INFI 90 and are not giving operators, managers and engineers data that is good enough.  You can do better:

Improved Tag and History Data Precision in INFI 90 Systems

There is also a design for you to be able to permanently and validly measure whether you ever get delayed or lost exception reports.  If you find you have nodes in the 50% or greater node communication CPU usage, you should worry about this.

Monitoring Exception Report Performance

Have you tried any of these techniques?  It would be very interesting to hear your experiences.

No comments:

Post a Comment